| Scope: Interior gut of the 400,000 square foot building, including asbestos and lead abatement. The original asbestos
abatement survey indicated only 10% of the eventual materials removed. Our scope also included the removal of two UST's and over 100
truckloads of contaminated soil.
Return to Projects Index.
|
|